Building a Temporary Coldstore For Fruit Storage

Due to a rapidly growing business and major contractual obligations, this client required a quick solution to increase their chilled storage capacity.

Client

A Fruit Packing Company

Industry

Food and other Perishable Products

Solutions

Temporary Cold Storage Building with Temperature Control

Power Requirement

300kW for 2 degrees holding temperature

The Cold Storage Hire Challenge;

Due to a rapidly growing business and major contractual obligations, this client required a quick solution to increase their chilled storage capacity. Having exhausted all other built options, the client approached us to provide an 875m2 building to be located in their car park. The additional space we created was used for the storage of soft fruits and required a holding temperature of 2 degrees at all times. As with all raw food storage areas, a high-quality safe finish was required.

The Temporary Cold Storage Solution

Our team recommended an aluminium framed building with an inflatable roof and 100mm PIR wall panels for increased efficiency. These buildings are held in stock and can be delivered and erected quickly. Although not completely flat, the car park was deemed as suitable for a high-quality resin floor without the use of our Heavy Deck flooring option, saving both time and costs.

Cooling was provided by five ACR LT50 low-temperature AHU hire units and four chillers with a combined capacity of 320kw. As with all our projects, we fitted multiple separate cooling systems into the cold stores to provide redundancy ensuring that any failures would have no negative impact on the store’s usage.

To read more about our cold store hire and related services please click here.

    Contact Us








    Project photo file

    Case Studies

    Please Find Below Links To Case Studies For Projects In Different Sectors.

    Shetland Island Council approached us with a vital strategic project for the island community. They required a full turnkey temperature controlled storage facility to house Scalloway Fish Market whilst its existing home was redeveloped.

    Read More

    Our client’s problem was having enough space for their peak periods. Cold storage proved tricky to maintain in readiness for the limited six or seven weeks of the year when it was really needed.

    Read More

    This project presented us with particular challenges in terms of equipment specification, installation and health and safety issues.

    Read More

    Our client, a large national food distribution company, required additional chilled storage capacity to fulfil contractual obligations.

    Read More

    In one of our largest jobs, with many different elements to consider, we created a separate area of our client’s deep chilled warehouse to be held at a fixed 15 degrees.

    Read More

    The Jersey Royal Company needed our help to keep their seed potatoes dormant while in storage.

    Read More

    See How we helped this nationwide flower distributer increase their chilled storage capacity for seasonal peaks. A full turnkey project with power generation.

    Read More

    Our client asked us to construct a temporary chilled building for a food packaging operation.

    Read More