Additional Cold Storage For Peak Flower Demand

Our client’s problem was having enough space for their peak periods. Cold storage proved tricky to maintain in readiness for the limited six or seven weeks of the year when it was really needed.

Client

A Major Flower Distributor

Industry

Flower Processing And Distribution

Solutions

Additional Chilled Peak Storage

Power Requirement

400kW - 5 x 50kW Low-Temperature AHU’s

The Cold Storage Capacity Challenge

Our client’s problem was having enough space for their peak periods. Cold storage proved tricky to maintain in readiness for the limited six or seven weeks of the year when it was really needed. In this case, around Christmas, Valentine’s Day and Mother’s Day. Renting was ideal as it created the much needed additional cold storage capacity without all the costs associated with owning it. The client identified a suitable building containing three areas with a total of 17,000sq/ft that required temporary cooling to four degrees.

The Temporary Cooling Rental Solution;

Following a detailed survey of the site we proposed that two systems be installed with separate generators and chiller systems. The larger system comprised a 280kW chiller and three 50kW low-temperature air handling units (AHUs). The smaller area benefited from 2x80kW chillers, each serving a 50kW AHU. Both systems were installed with stand-alone power generation. Chilled water and 30% glycol-mix provided the cooling.

Our client avoided the capital outlay or depreciation costs that come from owning equipment. They paid for additional storage through fixed weekly payments that could fully offset against gross profit. We provided all servicing and breakdown response services within the contract too.

For further help and advice regarding temporary cooling equipment to meet your peak demand, contact us here

    Contact Us








    Project photo file

    Case Studies

    Please Find Below Links To Case Studies For Projects In Different Sectors.

    Shetland Island Council approached us with a vital strategic project for the island community. They required a full turnkey temperature controlled storage facility to house Scalloway Fish Market whilst its existing home was redeveloped.

    Read More

    This project presented us with particular challenges in terms of equipment specification, installation and health and safety issues.

    Read More

    Our client, a large national food distribution company, required additional chilled storage capacity to fulfil contractual obligations.

    Read More

    In one of our largest jobs, with many different elements to consider, we created a separate area of our client’s deep chilled warehouse to be held at a fixed 15 degrees.

    Read More

    The Jersey Royal Company needed our help to keep their seed potatoes dormant while in storage.

    Read More

    See How we helped this nationwide flower distributer increase their chilled storage capacity for seasonal peaks. A full turnkey project with power generation.

    Read More

    Our client asked us to construct a temporary chilled building for a food packaging operation.

    Read More

    Due to a rapidly growing business and major contractual obligations, this client required a quick solution to increase their chilled storage capacity.

    Read More